ClarkDietrich logo

  • Company

    • About Us
    • Locations
    • Contact Us
  • Products

    • Interior Framing
    • Exterior Framing
    • Interior Finishing
    • Exterior Finishing
    • Floor Framing
    • Steel Framing Connectors
    • Wood Framing Connectors
  • Industry

    • SFIA
    • BuildSteel™
    • AWCI
  • Legal

    • Terms & Conditions
    • Patents & Trademarks
    • CA Transparency in Supply Chain Act

©2026 Clarkwestern Dietrich Building Systems LLC. All rights reserved.

  • About Us
  • Careers
  • Contact
  • Where to Buy
  • SubmittalPro®

​
ClarkDietrich logo
ClarkDietrich CD Link logo
ClarkDietrich logo
Cold-Formed Steel Solutions for Data Center Construction

Build Data Centers with Proven Cold-Formed Steel Systems

Data center construction requires framing systems that are strong, efficient and adaptable to complex project requirements. ClarkDietrich products are used throughout these facilities to support interior partitions, structural framing, rough openings, deflection conditions, fire-rated assemblies, security areas and impact-resistant applications.

Explore ClarkDietrich products commonly used in data center construction

Barrier Mesh for Security

High-strength expanded metal mesh for walls and ceilingsBarrier Mesh™ is a tough, rigid, heavy-gauge steel mesh installed typically onto stud framing (both metal and wood), with gypsum sheathing applied to its surface to conceal the barrier mesh, thereby providing a significant barrier to security breach across that wall system.
View Product Page

BlazeFrame® RipTRAK™

head-of-wall deflection track - 1 & 2 hour systemBlazeFrame RipTRAK is a deflection track with an offset shoulder that represents the thickness of the gypsum board (5/8" or 1-1/4”). A second piece of gypsum board (wall cladding strips) is fit flush to the underside of the slab (w/sealant) or to a fluted deck (without castle cuts & sealant), and is then fastened to the shoulder. This allows the roof/floor assembly and the BlazeFrame RipTRAK to move in relation to the wall assembly. This also allows the wall cladding strips (the rip board) that is attached to the BlazeFrame RipTRAK to slide over the primary wall assembly.
View Product Page

MaxTrak® Slotted Deflection Track

Performance that stands up to deflectionFor superior head-of-wall vertical deflection, and the added benefit of horizontal drift movement, ClarkDietrich has your answer.
View Product Page

FAS-093X Fire Rated Control Joint

FAS-093X fire rated control joint - profile for protection of control jointsFire Rated Control Joint is a composite control joint with intumescent tape factory applied to the back side of the control joint.
View Product Page

Structural Studs

ClarkDietrich Cold-Formed Steel C-Studs (C-Series™)Cold-Formed / Light-Gauge C-shaped framing members for axial load-bearing walls, curtain walls, tall interior partitions, floor joists and roof truss assemblies.
View Product Page

ProSTUD® Drywall Framing System

Steel Drywall Studs with smart edge™ technologyProSTUD Drywall Framing System (ProSTUD® and ProTRAK®) with Smart Edge™ Technology is the innovative steel drywall stud that sets a new industry benchmark for high performance. Its patented design combines high-strength steel with additional stiffening enhancements for a drywall framing stud previously unimagined.
View Product Page

RedHeader Lite Rough Opening System

replaces multiple jamb studs for interior rough openingsDesigned to replace conventional built-up jambs and headers while providing better results in half the time.
View Product Page

RedHeader PRO™ Rough Opening System

provides versatility for walls and ceilings contractorsDesigned to replace conventional boxed headers and built-up jambs and provide better results in half the time.
View Product Page

Spazzer® 9200 Spacing and Bridging Bar (SPZD)

Facilitates the rapid erection of interior, nonload-bearing studsPrenotched bridging and spacing bar.
View Product Page

FastBridge™ Clip (FB33, FB43 & FB68)

Used to secure u-channel to wall studs for lateral bracingThe ClarkDietrich FastBridge™ clip is used to secure U-Channel or Cold Rolled Channel (CRC) to structural or non-structural wall studs when used in load-bearing, curtain wall or drywall framing applications.
View Product Page